The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests
so as to enable sending of one CEB Engineer for witnessing of the factory tests. A ‘Factory Acceptance Test
’ schedule shall be
mutually agreed between the successful Bidder and the CEB Engineer.
NOTE: All charges inclusive of air tickets, food & hotel accommodation, local transportation and other living expenses
for the CEB Engineer shall be borne by the successful Bidder.
The successful Bidder shall submit to the CEB Engineer the following documents prior to shipment of the incinerator
set.
? Certificate of Conformity inclusive of the clause ‘We certify that, subject to exceptions or concessions
listed here after, the supplies detailed above were manufactured in accordance with the technical specifications of the
contract, order and that, all inspections and tests having been completed, the supplies comply in every aspect with the
relevant particular specifications, drawings, and relevant standards and regulations in force’.
? Factory Acceptance Test(FAT) Certificates
? Bill of Material (BOM)
? Three(3) Complete Sets of As-Built Drawings
? Installation and commissioning procedure for the incinerator set.
? Program of works for carrying the installation and commissioning
? Labour and logistic requirement for carrying the installation and commissioning.
? All electrical drawings and wiring diagrams
Type of Waste: To treat medical waste, categories A, B, C, D,E
Type of incinerator: Pyrolytic
Nominal Burn Rate: 50 to 60 Kg/hrat 3500Kcal/Kg
Loading: Manual, Batch Load
De ashing: Automatic or manual batch de ashing
The incinerator must avoid the release of black smoke and
fine dust, during the loadings
Primary Chamber Capacity: 2 -3 m3
The insulation of the combustion chamber should be composed of
refractory bricks, having a high content of aluminium and insulates,
The plate of combustion in carborundum avoiding the fixing of
glass and slags
Hours of operation/day: >10 hrs
Max operating Temperature : 14000C
Normal Operating Temperature (Primary): >8500C
Operating Temperature (Secondary): >11000C
It should have temperature regulators in digital watch:
Carbon Content of Ash: <2%
The installation should be completely free from visible smoke as well
as offensive odours.
Residence Time in Second Chamber: 2 seconds minimum
The Internal diameter of the Chimney : Ø 400
Height of Stack: >8 m
Burner operation: Automatic On/Off
Fuel: Diesel
Fuel Consumption at rated capacity: >7 Kg waste/ltr
Electricity Consumption: <2kW at rated capacity
Operating Voltage: 220-240VAC 50 Hz
Spare Parts: Supply for 1 year quoted as option
Consumables: Supply for one year of operation to be mentioned
as option
Warranty: Parts and service support: 1 year minimum post
commissioning
Service Support: <72 hours.
Emission Standards Compliance: BS 3316 or équivalent standard
Process Filtering system: Scruber to be mentionned as option
CE Manufacturing Compliance: BS EN 746-2-1997
Design Specification: Types A, B, C, D, and E of medical waste
Installation and Commissioning: Included in conditions of supply
Training in preventive and curative maintainance and use
of the incinerator: Operator training inclusive in offer
Capacity to treat Plastic: Not less than 40% by weight
Shed of the incinerator
Shelter of the incinerator inclusive in offer (the shelter must have
facilities for hand washing and firefighting).
This material and equipment must include in the shed of the
incinerator:
* Foundation in rubble stone,
* Isolation roofing against humidity;
* Elevation with brick of 20 cm (bloc cement), continuing lintel
(linteau) in reinforced concrete;
* Steel frame (charpente en metal);
* Roofing in sheet B.C.A. 28 BG (Toiture en tôle),metal gutter,
* Sanitary installation (wash basin, soak way pit of 20 m of depth);
* Ash pit of 30 m3,
* Electrical installation;
* Concreteslab for fixing the incinerator;
* Chanel for evacuation of rain water or waste water
* Wiremesh for aeration up the lintel;
* smoothrougtcasting of walls (interior and outside);
* plinth with cement;
* 2 metal doors ;
* Enemail paintings inside and latex paintings outside the shelter
on walls and on doors;
* Roofing limit (planche de rive);
* Measures for this specification will depend on the size of the
incinerator which will determine the size of the shed of the incinerator.
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]