secondary chamber
1000 degree
chimney
standard
shredder
separately
Autoclave or microwaves
separately
temperature monitor
attached outside of machine
operating
Fuel and electric
During the start and end incineration operations at the waste incineration plant the temperature shall be maintained
at 850 °C, while it shall be 1100 °C when incinerating dangerous waste containing halogenated organic substances with
content of chlorine or its compounds. The temperature shall be maintained at 1000 °C during incineration of medical
waste.
MUNICIPAL SOLID WASTE INCINERATORS
Municipal waste incinerator quantities and capacities shall be designed for 24-hour 7-day-a-week continuous operation.
Incinerators shall be capable of processing both wet and dry material and operating on either diesel fuel, JP-8 fuel,
or waste oil; see Plumbing for fuel storage system requirements. The following shall be provided as a minimum:
Reinforced concrete mounting foundations, feed or charging hoppers (or loaders), primary combustion chambers
with ash cleanout doors, secondary combustion chambers with ash cleanout doors, cyclone air filters (or separators),
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]

