Waste kind: health care waste
Waste density: 125 to 350Kg/M3
Waste calorific well worth: 4000KCAL/kg
Dampness web content: 10– – 25%. Approximated ash deposit: 5– – 10%. Nominal ability: 50kg/hr set lots.
2nd chamber: 2 [e-mail protected] C.
Environmental: NEMA ACT (EMCA) 1999, Waste Keeping track of plans, 2006.
Trick Burning chamber:.
The major burning chamber is the significant structure of the heater, produced from moderate steel plate in addition to tensed with rolled steel areas.
It is carried from the floor covering level on a considerable steel support structure. Inside the covering is lined with calcium silicate insulation as well as likewise a warm face combination of incredibly commitment brickwork or high stamina castable.
The main burning chamber must make certain minimum separation temperature level is not much less than 850? C.
One Hand-operated Lots Burner making up:.
Hand-operated loading door.
Straight strong fireplace, refractory lined primary burning chamber. Approximate. dimensions 800x2100mm( DxL).
Total sized mass load/ash elimination door.
1 off diesel-fired ignition burner– – temperature level managed.
1 off combustion air supply follower as well as distribution system, automated control.
High capacity second burning chamber with residence time very little less than 2 secs @ >> 850? C.
1 off diesel-fired afterburner– – temperature regulated.
Control panel– – automated treatment.
Temperature indicator additional and also primary chambers 0-1200? C.
Refractory lined flanged chimney to an elevation of 10M above ground level.
NB: The extra combustion chamber must make certain that the gas temperature level as gauged versus the within wall in the 2nd chamber & & & & not in the fire area, is not less than 1100? C
Throughput: 50kg/hr at a small calorific worth of 4,000 kca/kg as well as a typical mass density of 120kg/m3 for fundamental waste in addition to 160kg/m3 for healthcare waste.
Ash: The waste will be lowered by 90 ~ 95% to leave 10-5% ash.
Quality/Environmental Criteria: NEMA ACT (EMCA) 1999, BS3316.
Running period: prepared for day-to-day operating period 8 hours.
Maximum operating period: 12 hrs.
Chamber: must be refractory lined to the list below need;.
Hearth as well as additionally lowered section of chamber wall surface surfaces.
Warm face item:.
Super obligation firebrick.
Restricting constant solution restriction 1500? C.
Thickness: 100mm.
Thermal conductivity: 1.3 W/mk.
Insulation:.
Calcium silicate.
Limiting continual solution limit 1000? C.
Density: 25mm.
Thermal conductivity: 0.095 W/mk.
Chimney/Stack: Ought to be made from refractory lined modest steel or superb high quality air-cooled s/s.
The chimney/stack should have a minimal height of 10m over ground degree.
Ignition heating units: fully packaged oil kind, overall with electrical ignition in addition to fire failing controls, wired with continuous running follower in addition to complete with all shutoffs, fan as well as electric motor.
Optimum score: a minimum of 450kW/hr.
Heater: set up on/off procedure.
Maximum consumption: at the very least 6Ltrs/hr.
Typical intake: a minimum of 3Ltrs/hr.
Afterburner:.
fully packaged oil kind, total with electric ignition as well as additionally fire stopping working controls, wired with continual running fan as well as also amount to with all valves, fan as well as additionally motor.
Optimum rating: at the very least 450kW/hr.
Heating unit: arranged for on/off treatment.
Maximum use: at the very least 9Ltrs/hr.
Common usage: at the very least 4.5 Ltrs/hr.
Flue gas therapy: should have particle eliminator (scrubbers).
Electric supply: solitary stage: 220/240VAC; 50/60Hz
Documents:.
scientific waste heater to buy Procedure manual: 2 collections.
Service/maintenance manual: 2 sets.
Certification: NEMA (or other identified) certification.
Capability to solution tools: the agent/supplier will have sufficient centers, extra parts, consumables as well as likewise certified skilled technical team.
Training: the Agent will execute a 2 days heaters training after installment and likewise selecting of the devices.
The Rep will certainly do a 2 days procedure & & & & upkeep training to the Biomedical design workers after installation & & & & appointing of the devices.
HICLOVER is growing brand for environmental protection field, and market share with most of Africa, Middle East, Southeast Asia countries and part of North America, Europe territory. We are trusted partner for governmental organizations, non-profit organizations, international contractors, logistics organizations, military, pet cremation business owners, etc. We have export experience more than 40 countries, including war zone like Iraq, Afghanistan, Somalia, South Sudan. Mobile: +86-13813931455(WhatsApp) Website: www.hiclover.com Email: [email protected] Email: [email protected]