medical incinerator china

Related The Application of Open Burning and Incineration Biomedical waste management ppt small scale medical waste incinerator Waste Disposal Methods in Hospital www.clover-incinerator.com Tagsincinerator incinerators waste HICLOVER.COM https://www.youtube.com/watch?v=BxiEa3XYvBsContact Us Tel:…[...]

Smaller cremators incinerators

Smaller cremators that will run diesel and will be capable of doing all the other dogs/cats/pets that we have. We only cremate pets individually so this is what we require. Have your company as member of Markis Hospital waste management group as planer or supplier, contractor of solutions or operating partners of the solution of hospital waste management in the projects we are developing, starting with Larissa and Volos. Members of Markis waste management group will also have the possibility to provide training and technical services to the health sector of Greece and other countries via the TSC which we plan to make the same time in Larissa (enclosed diagram indicates the role of each party joining Markis waste management group). ● Able to burn 25-30kg per hour ● Consist of two chambers to ensure significant reduction in emission ● Be capable of temperature in range of 800c to 1000c ● Low maintenance design ● Must be Diesel fuelled ● Need more than 15amp 220- 250V power ● kW Consumption power consumption to be stated ● Onboard or in-built fuel storage storage tank & should use no more than 12L of dies el per hour to burn 25-30kg of waste ● Solid waste reduction in range of 90-97% ( should be routinely achieved) 1. –  2 medical waste autoclaves 350ltr and 100ltr 2. – 1 medical waste shredder 3. –  3 medical macerators 4. – 27 Waste transfer trolleys.[...]

new hospital waste treatment plant

We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg[...]

new hospital waste treatment plant

We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg[...]