Incinerator Main Combustion Chamber

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial  trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed. Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures,  eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal  for military and civil camps and remote locations where infrastructure is scarce. Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with  other disposal methods. Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the same place where it was generated to avoid  cross-contamination risk and to keep waste treatment costs at acceptable level. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd..

Incinerator Main Combustion Chamber

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial  trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed. Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures,  eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal  for military and civil camps and remote locations where infrastructure is scarce. Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with  other disposal methods. Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the same place where it was generated to avoid  cross-contamination risk and to keep waste treatment costs at acceptable level. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd..

Pig corpses / stray dogs and larger animal carcasses

Pig corpses / stray dogs and larger animal carcasses – Load capacity in the range of up to 300 kg / Burn rate approx. 50 kg per hour Temperature Controlled Burner. Incinerators to be designed to meet the Norms of Pollution Control. Technology: Heavy-duty casing, to be a quality, rugged, reliable, economical Incinerator with relevant control, easy to operate and self-contained. Units to be pre-assembled, pre-piped, pre-wired & tested before Transport / Export The supply will comprise the special equipment for effective medical / clinical waste management as mentioned above for a new private environment management company with operations in West and East Malaysia; Indonesia and Thailand to carry out those professional services in order to comply with the safe disposal requirements for clinical and medical waste in the region and to meet the higher technical standard in this particular field. 1.Burning rate: 250 Kg/hr.  2.It should be able to Operate not Less than 10 hours/day 3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…  4.Design Specification: Types A, B, C, D, and E of medical waste 5.“PYROLYTIC” combustion, by controlling the gasification of waste.  6.The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings. 7.It should be able to reduce the volume of wastes by 98%. 8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.  The incineration should be completely free from visible smoke as well as offensive odours.  9. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg  The Temperatures of combustion: Minimum will be 850oC and max 1400oC Post combustion: >1100oC. 10. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter   11. The Volume of the combustion chamber: Not Less Than 2.3 M³  12. Burner operation should be Automatic On/Off 13. Fuel : diesel, LPG, Natural Gas, Bio fuel 14. The supplier must provide  necessary information for the best of  the installation 

Pig corpses / stray dogs and larger animal carcasses

Pig corpses / stray dogs and larger animal carcasses – Load capacity in the range of up to 300 kg / Burn rate approx. 50 kg per hour Temperature Controlled Burner. Incinerators to be designed to meet the Norms of Pollution Control. Technology: Heavy-duty casing, to be a quality, rugged, reliable, economical Incinerator with relevant control, easy to operate and self-contained. Units to be pre-assembled, pre-piped, pre-wired & tested before Transport / Export The supply will comprise the special equipment for effective medical / clinical waste management as mentioned above for a new private environment management company with operations in West and East Malaysia; Indonesia and Thailand to carry out those professional services in order to comply with the safe disposal requirements for clinical and medical waste in the region and to meet the higher technical standard in this particular field. 1.Burning rate: 250 Kg/hr.  2.It should be able to Operate not Less than 10 hours/day 3.This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…  4.Design Specification: Types A, B, C, D, and E of medical waste 5.“PYROLYTIC” combustion, by controlling the gasification of waste.  6.The incinerator must avoid the release of black smoke and fine dust, (Smokeless) during the loadings. 7.It should be able to reduce the volume of wastes by 98%. 8.It should be able to hold emission in the second burn with gas residence of not less than 2 seconds.  The incineration should be completely free from visible smoke as well as offensive odours.  9. The lower calorific power (L.C.P) of this waste will be 3,500 kcal/kg  The Temperatures of combustion: Minimum will be 850oC and max 1400oC Post combustion: >1100oC. 10. The Internal diameter of the Chimney: Ø 400mm² and its height: 8 Meter   11. The Volume of the combustion chamber: Not Less Than 2.3 M³  12. Burner operation should be Automatic On/Off 13. Fuel : diesel, LPG, Natural Gas, Bio fuel 14. The supplier must provide  necessary information for the best of  the installation 

Incinerator Primary Combustion Chamber

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial  trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed. Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures,  eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal  for military and civil camps and remote locations where infrastructure is scarce. Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with  other disposal methods. Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the same place where it was generated to avoid  cross-contamination risk and to keep waste treatment costs at acceptable level. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201    Website: www.hiclover.com   Email: [email protected] Email: [email protected]  

Incinerator Primary Combustion Chamber

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial  trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed. Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures,  eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal  for military and civil camps and remote locations where infrastructure is scarce. Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with  other disposal methods. Incineration perfectly fits into a trend of treating waste in a safe way, and if possible, at the same place where it was generated to avoid  cross-contamination risk and to keep waste treatment costs at acceptable level. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201    Website: www.hiclover.com   Email: [email protected] Email: [email protected]