About Hiclover Medical Enviromental

HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal solid waste incineration project. We supply single combustion chamber, double…[...]

Waste Incineration Treatment BURNING RATE 100-150kgs per hour HICLOVER TS150

Animal diseases, new virus strains and spread of infectious diseases are only few of the consequences of improper animal waste treatment. Incineration is the way forward for Bio-secure waste disposal.…[...]

Small incinerators for the solid waste equipment in waste management yard

Incineration is the most obvious solution for total destruction of municipal waste, avoiding all the direct and indirect risks associated with other disposal methods. Incineration perfectly fits into a trend…[...]

Disposal of biohazard waste

Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator manufacturer in China. We are local  manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical…[...]

new hospital waste treatment plant

We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg[...]

new hospital waste treatment plant

We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world.  We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating.  Please send me all general information and quotes for machines of all ranges that could meet our needs.  Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to  dioxins and furals as well as lists of recommendations from past clients.  If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use.  Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance.  Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg[...]